White River Junction Design Review District
White River Junction's natural beauty and visual and historic character are important assets to the town and contribute substantially to its economic base. In order to protect and enhance these attributes, the design review process ensures that development considers
- Existing architecture
- Sign placement and design
- Site layout
- Streetscape design
Although the reuse of existing buildings is encouraged wherever possible, new construction is appropriate when designed with sensitivity to the historic character and design features in the district. Specific recommendations for the development and redevelopment of the downtown are made in the:
- White River Junction Design Guidelines (2001) (PDF)
- White River Junction Design Plan (2001) (PDF)
- White River Junction Design Regulations (PDF)
- White River Junction Design Review Map (PDF)
These documents are incorporated into the Zoning Regulations by reference.
Within this designated district, all structures that are erected, reconstructed, altered, restored, moved, or demolished, or any type of land development, such as fencing, landscaping and signs, must be in compliance with the Design Review sections detailed in the bylaw. Not all improvements require review by the 5-member Design Review Committee, which makes recommendations to the Planning Commission.
To find out more, email Lori Hirshfield or call 802-295-3075.
Zoning Permits
A zoning permit is required prior to any land development in the Town of Hartford. Land development is defined as "the division of a parcel into two or more parcels; the construction, reconstruction, conversion, structural alteration, relocation or enlargement of any building or structures; excavation in excess of 20 cubic yards of material per year or filling in excess of 200 cubic yards per year; any change in use of any building or other structure, or land, or extension of prior use."
Once a complete zoning permit application is submitted, it is reviewed, and a decision is rendered within 10 business days. The State of Vermont requires a 15-day appeal period once an application is approved before the permit is effective and issued. Once a zoning permit is issued, work must be started within six months and be completed within two years of the date of issue, or the zoning permit will become null and void. One six-month extension to both time periods may be granted by the Planning Commission prior to the start or completion dates.
You can reach the Planning staff at 802-295-3075 with any permitting questions.
Certificates of Occupancy
After the issuance of a zoning permit and prior to occupying a structure, the applicant must obtain a Certificate of Occupancy (CO). A CO ensures that all approved projects are in compliance with the Zoning Regulations and any other required conditions of approval for the project. Contact the Department at 802-295-3075 to arrange an inspection for issuance of a CO. Be certain to complete the CO Application - Certificate of Compliance (PDF).
Sign Permits
The Sign Ordinance governs many aspects of signs and the standards vary by zoning district. Most signs require a Sign Permit (PDF). A list of exceptions is available at the Department of Planning and Development Services.
Home Occupations / Home Businesses
The purpose of the Home Occupation (PDF) and Home Business Permit (PDF) are to regulate the usage of homes as offices and businesses. A zoning permit is required for both.
Subdivision
The division of a parcel into 2 or more parcels, revisions to a previously approved subdivision or other division of land for the purpose of sale, lease, license, and land development requires subdivision approval by the Planning Commission. The Town of Hartford has regulations regarding the subdivision of land. Copies are available at the Department of Planning and Development Services. Subdivision applications require a public hearing with the Planning Commission. Public hearings are held every 5 weeks.
Zoning permit application forms are available at the Department of Planning and Development Services. For more information, please email Zoning Administrator Jo-Ann Ells or Assistant Zoning Administrator Matt Osborn or call 802-295-3075.
Site Development Plans
Any use other than single-family, 2-family dwellings or any structure and improvement to such use may not be established, expanded, or modified without site development plan approval by the Planning Commission. Home occupations, forestry, and agricultural uses are also exempt from site development plan approval. Upon the receipt of a zoning permit application, the zoning administrator will determine if site development plan approval is required. The Planning Commission reviews site development plans with respect to the following:
- Compliance with other provisions of the zoning regulations
- Landscaping, screening, and setbacks
- On-site circulation, parking, and loading facilities
- Protection of renewable energy resource
- Provision of safety and convenience for pedestrians, bicyclists, and handicapped persons
- Traffic circulation between the site and the street network
Site Development Plan standards and other zoning regulations that may apply to a project are located in the Hartford Zoning Regulations. Copies are available at the Department of Planning and Development Services. Most site development plan applications require a public hearing with the Planning Commission. Public hearings are generally held every 5 weeks. Copies of the public hearing schedule are available at the Department of Planning and Development Services or by clicking here. For more information, please contact Zoning Administrator Jo-Ann Ells at 802-295-3075.
Conditional Use Permits
Each zoning district breaks down uses into 2 categories - permitted uses and conditional uses. Permitted uses are allowed with a zoning permit and sometimes require site development plan approval by the Planning Commission. Conditional uses are allowed if specific criteria (listed below) are met to ensure that the use is appropriate for the area. Upon receipt of a zoning permit application, the Zoning Administrator will determine if a Conditional Use Permit is required. An application for a conditional use permit is reviewed by the Zoning Board of Adjustment, who reviews the application to ensure that the following standards are met:
- Any town bylaw in effect
- Capacity of existing and planned community facilities
- Capacity of the roads and highways in the vicinity
- Character of the area affected
- Objectives of the zoning district
- Utilization of renewable energy resources
Almost all conditional uses also require site development plan approval by the Planning Commission. Conditional use permit standards and other zoning regulations that may apply to a project are located in the Hartford Zoning Regulations. Copies are available at the Department of Planning and Development Services. Most conditional use permit applications require a public hearing with the Planning Commission. Public hearings are held every 5 weeks. Copies of the public hearing schedule are available at the Department of Planning and Development Services. For more information, please email Zoning Administrator Jo-Ann Ells or call 802-295-3075.
Variances
The purpose of a variance is to gain relief from a provision of the zoning regulations. A variance allows an applicant to depart from the requirements of the zoning regulations provided that the applicant can prove adherence to the variance or setback waiver criteria as established by state statute. The Zoning Board of Adjustment reviews variance applications based on the following criteria:
- Due to such physical circumstances or conditions, there is no possibility that the property can be developed with strict conformity with the provisions of the Zoning Regulations, and a variance is necessary to enable reasonable use of the property.
- The unnecessary hardship has not been created by the applicant.
- The variance does not alter the essential character of the neighborhood, substantially or permanently impair the appropriate use or development of adjacent property, reduce access to renewable energy resources or be detrimental to the public welfare.
- The variance will represent the minimum variance that will afford relief and will represent the least deviation possible from the zoning regulations.
- There are unique physical circumstances or conditions peculiar to the property.
Upon receipt of a zoning permit application, the Zoning Administrator will determine if a variance is required. Variance applications require a public hearing with the Planning Commission. Public hearings are held every 3 weeks. Copies of the public hearing schedule are available at the Department of Planning and Development Services.
Flood Hazard Area Regulations
The Town of Hartford regulates development within flood hazard areas as defined by the Federal Emergency Management Agency Flood Insurance Rate Maps. Copies are available at the Department of Planning and Development Services. For more information, please email Zoning Administrator Jo-Ann Ells or call 802-295-3075.
Fee Schedule
The following is a list of fees for each type of permit and service provided by the Department of Planning and Development Services.
Document Hard Copy Fees
Document | Fee |
---|---|
Master Plan | $20 |
Regulations/Master Plan (CD) | $5 |
Subdivision Regulations | $5 |
Zoning Regulations | $10 |
Municipal Water, Sewer or Driveway Permits
Note: Applicants utilizing Municipal water and/or sewer, adding or changing driveway, must see Public Works located at Airport Drive, prior to submitting the application to Planning and Development in order to obtain the contract and any applicable fees or liens (contract copy must be attached).
Planning & Zoning Resources
- Accessory Dwelling Units (PDF)
- Administrative Approval Form (PDF)
- Application for Building or Zoning Permit (PDF)
- Application to Planning Commission or Zoning Board of Adjustment (PDF)
- CO Application - Certificate of Compliance (PDF)
- Fee Schedule (PDF)
- Hartford Master Plan 2014 (PDF)
- Home Business Permit (PDF)
- Home Occupation (PDF)
- Notice of Appeal (PDF)
- Notice of Intent - Agriculture Structure (PDF)
- Notice of Intent - Ramp (PDF)
- Quechee Lakes Master Plan (PDF)
- Request for Zoning Permit Extension (PDF)
- Route 5 South Study - May 2001 Final (PDF)
- Sign Ordinance (PDF)
- Sign Permit (PDF)
- Sykes Mountain Avenue Study - March, 2000 (PDF)
- Townwide Zoning Map (PDF)
- White River Junction Design Guidelines (2001) (PDF)
- White River Junction Design Plan (2001) (PDF)
- White River Junction Design Regulations (PDF)
- White River Junction Design Review Map (PDF)
- White River Junction Revitalization Plan (PDF)
-
Lori Hirshfield
DirectorPhone: 802-478-1119
-
Planning & Development
Physical Address
171 Bridge Street
Hartford Town Hall
White River Junction, VT 05001
Phone: 802-295-3075Fax: 802-295-6382
Hours
Monday through Friday
8 am to 5 pm