2022 to 2023 Gates Street (Hill) & Fairview Terrace Roadway & Retaining Walls Engineering
The Department of Public Works released an RFP for civil, electrical, geotechnical, structural and transportation engineering services related to the reconstruction and stabilization of the roadway and retaining walls along Gates Street from Maplewood Terrace to Fairview Terrace on February 28, 2022.
-
2023 Currier Street Completion
The construction of Currier Street will be completed to connect to South Main Street, and will consist of the regrading and paving the roadway; installation of sidewalks, lighting, dumpster pad and enclosure, and stormwater infrastructure; and incorporating green space and tree plantings.
-
2023 Fairview Terrace Water Main Replacement
This project consists of installing approximately 840 linear feet of 8 inch ductile iron water main and appurtenances easterly along Fairview Terrace from Gates Street to the end of the road and then cross country to the intersection of Gates Street and Maplewood Terrace replacing an old and undersized main along Fairview Terrace and eliminating the aging water main from the hill section of Gates Street with a failing slope / wall.
-
2023 Old River Road Drainage Improvements
Drainage improvements along Old River Road just south of the Quechee West Hartford Road are planned for the summer of 2023.
-
2023 Quechee Main Street Culvert Replacement
This project consists of replacing an existing 5-foot diameter CMP culvert with a new 6-foot high and 10-foot wide precast concrete box culvert, including water main, sewer main, and storm drain relocations, reconstruction of a stone masonry wall, and pavement restoration.
-
2023 Road Reclamation & Paving
Summer 2023 Paving and Reclamation Projects are currently out to bid.
-
2023 South Main Street Parking Lot Rehabilitation
The existing municipal parking lot will be redeveloped and will consist of the following items: regrading and repaving the lot, meeting requirements of the Americans with Disabilities Act, providing access for emergency vehicles, adding lighting for safety, increasing the number of parking spaces, incorporating areas of green space to improve aesthetics, incorporating stormwater treatment practices, and relocate and add electric vehicle charging stations.
-
2023 to 2024 VA Cutoff Bridge Replacement
Did You Miss the June 22 Public Information Meeting for the Hartford Bridge #7 Replacement Project?
-
Hartford Avenue Sidewalk Reconstruction & Resurfacing Project
The Town of Hartford is currently seeking sealed bids from qualified contractors.
-
Summer 2023 Paving / Reclamation Projects - Bid Specifications (PDF)
Read the bid specifications.
-
Upcoming Wilder Water Main Improvements
The Town of Hartford is currently planning for improvements to the water distribution network in Wilder.